Chapter 7 1/4 – Floodplain Management Ordinance

 

Sec. 7 ¼ - 1 – Purpose – the purpose of this Floodplain Management Ordinance is to ensure public safety, minimize hazards to persons and property from flooding, to protect watercourses from encroachment, and to maintain the capability of floodplains to retain and carry off floodwaters.

 

Sec. 7 ¼ - 2 – Definitions – Unless specifically defined below, words and phrases used in this chapter pretain to floodplain management, have the same meaning as they have in common usage and to give this chapter it’s most reasonable application.

 

1) Accessory Structure – A structure which is on the same parcel of property as the princicpal sftrcuture to be insured and the use of which is incidental to the use of the princiap structrure.

 

2) Area of Special Flood Hazard – see definitions for “Special Flood Hazard Area”

 

3) Base Flood – The flood having a one (1) percent change of being equaled or exceeded in any given year.

 

4) Base Flood Eleveation (BFE) – The elevation of the crest of the base flood or 100-year flood. The height, as established in relation to the North American Vertical Datum (NAVD) of 1988 (or other datum where specified), in relation to mean sea level expected to be reached by the waters of the base flood at pertininent points in the floodplains of coastal and riverine areas.

 

5) Basement – Any area of a building having its floor subgrade (below ground level) on all sides.

 

6) Building – see definition for “Structure”.

 

7) Cost – As related to substantial improvements, the cost of any reconstruction, rehabilitation, addition, alteration, repair or other improvement of a structure shall be established by a detailed written contractor’s estimate. The estimate shall include, but not be limited to: the cost of materials (interior fininshin elements, structural elements, utility and service equipment); sales tax on materials, building equipment and fixtures, including heating and air conditioning and utility meters; labor; built-in appliances; demolition and site preparation; repairs made to damage parts of the building worked on at the same time; contractor’s overhead; contractor’s profit; and grand total. Items to be excluded include: cost of plans and specifications, survey costs, permit fees, costs to correct code violations subsequent to a violation notice, outside improvements such as septic systems, water supply wells, landscapting, sidewalks, fences, yard lights, irrigation systems, and deatched structures such as garages, sheds, and gazebos.

 

8) Development – Any man-made change to improved or unimproved real estate, including but not limite to the construction of buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations or storage of equipment of materials.

 

9) Existing Manufactured Home Park or Manufactured Home Subdivision – A manufactured home park or manufactured home subdivision for which the construction of facilities for servicing the lots on which the manufactured home are to be affixed (including, as a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of the floodplain management regulation adopted by a community.

 

10) Expansion to an Existing Manufactured Home Park or Existing Manufactured Home Subdivision – The preparation of additional sites by the construction of facilities for servicing the lots on which the manufacturing homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrtete pads).

 

11) Federal Emergency Management Agency (FEMA) – The federal agency that administers the National Flood Insurance Program (NFIP).

 

12) Flood or Flooding – A general and temporary condition of partial or complete inundation of normally dry land areas from either the overflow of inland or tidal waters, or the unusual and rapid accumulation of runoff of surface waters from any source.

 

13) Flood Insurance Rate Map (FIRM) – The official map of a community on which the Federal Insurance Administrator has delineated both the special hazard areas and the risk premium zones applicable to the community. A FIRM that has been made available digitally is called a Digital Flood Insurance Rate Map (DFIRM).

 

14) Flood Insurance Study (FIS) – The official study of a community in which the Federal Emergency Management Agency (FEMA) has conducted a technical engineering evaluation and determination of local flood hazards, flood profiles and water surface elevations. The Flood Insurance Rate Maps (FIRM), which accompany the FIS, provide both flood insurance rate zones and base flood elevations, and may provide the regulatory floodway limits.

 

15) Flood Proofing – Any combination of structural and non-structural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.

 

16) Floodway – The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height. For the purposes of these regulations, the term “Regulatory Floodway” is synonymous with the term “Floodway”.

 

17) Freeboard – A factor of safety usually expressed in feet above a flood level for purposes of floodplain management. “Freeboard” tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization of the watershed.

 

18) Functionally Dependent Use of Facilty – A use that cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities.

 

19) Highest Adjacent Grade (HAG) – The highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure.

 

20) Historic Sturcure – Any structure that is: (a) Listed individually in the National Register of Historic Places (a listing maintained by the Department of of the Interior) or preliminarily determind by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; (b) Cerfitifed or prelminiarly determined by the Secretary of the Interior as contributingto the historic significance of of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district; (c) Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretayr of the Interior; or (d) Individually listed on a olocal invietory of historic places in communities with historic preservation programs that have been certified either : (1) By an approved state program as dtereminded by the Secretary of the Interiro or (2) Directly by the Secretary of the Interior in states without approved probrams.

 

21) Lowest Flood – The lowest floor of the lowest enclosed area (including basement). An unfinished or flood resistant enclosure, usable solely for parking of vehicles, buildng access or storage in an area other than a basement is not considered a building’s lowest floor; Provided, that such enclosure is not build so as to render the structure in violation of the applicable non-elevation design requirements of 60.3.

 

22) Manufactured Home – A structure, transportable in one (1) or more sections, which is built on a permanent chasis and is designed for use with or without a permanent foundation when attached to the required utilities. The term “manufactured home” does not include a “recreational vehicle”.

 

23) Manufactured Home Park or Manufactured Home Subdivision – A parcel of contiguous parcles of land divied into two (2) or more manufactured home lots for rent or sale.

 

24) Market Value – Market value is the price of a structure that a willing buyer and seller agree upon. This can be determined by an independent appraislal by a professional appaiser; the property’s tax assessment, minus land value; the replacement cost minus depreciation of the structure; the structure’s Actual Cash Value.

 

25) New Construction – Structures for which the “start of construction” commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, new construction means sturcutres for which the start of construction commeneced on or aftrer the effective date of a floodplain management regulation adopted by a community and includes any subsequent improvements to such structures.

 

26) New Manufactured Home Park or Manufactured Home Subdivision – A manufactured home park or manufactured home subdivision for which the construction of facilities for servicing the lots on which the naufactuterde home are to be affixed (including ata  minuimu, the installation of utilizes, the construction fostreets, and either tinfal site grading or the pouring of concrete pads) is completed on aor after the effective date of floodplain regulartions adoped by the community.

 

27) Recreational Vehicle – A vehicle which is:

(a) Built on a single chasis;

(b) Four hundred (400) square fee or less when measured at the largest horizontal projection;

(c) Desiged to be self-propelled or permanantely towable by a light duty truck; and

(d) Designed primarily not fur use as a permanent dwelling buy as a temporary living quarters for recerrateional, camping, travel, or season use.

 

28) Regularoty Floodway – see definition for “Floodway”.

 

29) Special Flood Hazard Area (SFHA) – The land in the floodplain within a community suject to a one (1) percent or greater chance of flodding in any given year. After detailed ratemaking ghas been complete in preparation for publication of the flood insurance rate map, Zone A usually is refined into Zones A, AO, AH, A1-30, AE, A99, AR, AR/A1-30, AR/AE, AR/AO, AR/AH, AR/A, VO, or V1-20, VE, or V. For purposes of theses regulartions, ther term “special flood hazar area” is synonymous with the phrase “area of special flood hazard”.

 

30) Start of Construction – For other than new construction or substantial improvements under the Coastal Barrier Resources Act (P.L.97-348), includes substantial improvement and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition placement, substantial improvement or other improvement was within one hundred and eithgy (180) days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the puring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation, or the placement of a manufactured home on a foundation. Permatnent construction does no include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erections of temporary forms; nor does it include the indatallation on the property of accesrroy buildings, such as garages or sheds not occupied as dwelling usints of not part of the mani structure. For a substantial improvement, the acutal start of construction means the first alteration any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affectst the external dimensions of the building.

 

31) Structure – For floodplain management purposes, a walled and roffed building, including a gas or liquied storatge tank, that is principally above ground, as well as a manufactured home. For insurance purpose, means:

 

(a.) A building with two or more outside rigid walls and a sfully secured roof, that is affixed toa  permanent site:

(b.) A manufactured home (“a manufactured home,” also know as a modile home, is a structure; build on permaenet chassis, transported to its site in one or more sections, and affixed to a permanent foundation); or

(c.) A travel trailer without wheels, built on a chassis and affixed to a permanent foundation, that is regulated under the communitey’s floodplain management and building ordiances or lwas.

For the latter purpose, “structure” does not mean recreational vehicle or a park trailer or other similar vehicle, ecept as descirbbed in paragraph (3) of this definition, or a gas or liquid storage tank.

 

32) Substantial Damge – Damage of any oridgin sustained by a structure, whereby the cost of restoring the structure to before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred.

 

33) Substantial Improvement – Any reconstruction, rehabilitation, addition or other imrpvemvemetns to a structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the “start of construction” of the improvement. This erm includes structures which have incurred “substantial damage”, regardless of the actual repair work perfoemd. The term does not, however, include:

 

(a.) Any project to correct existing violations of state of loca health, sanitary, or safety coded specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure sagfe living conditions or

(b.) Any alteration of the “historic structure”, provided that the alteration will not preclude the sturcutre’s contienuded designation as a “historic structure”.

 

34) Variance – A grant of relief by a community form the terms of the floodplain management ordinance that allows construction in a manner otherwise prhobited and where specific enformatne ould result in unnecessary hardship.

 

35) Violation – Failure of a structure or other development to be fully compliant wih the comunitye’s floodplain management ordinance. Construction of other development without required permits, lowest floor elevation documentation, flood-proofing cerftiifcates or required floodway encroachment acluculation is presumed to be in violation until such time as that documentation is provided.

 

Sec. 7 ¼ - 3 – Applicatbility

 

Section A. Special Flood Hazard Areas

 

1) Special Flood Hazard Areas Overlay District. The Special Flood Hazard Areas are herin established as a floodplain overlay district. The District includes all special flodd hazard areas within the City of Woonsocket designated as Zone A, or AE, on the Providence XCounty Flood Insurance Rate Map (FIRM) for the administration ont eh National Flood Insurance Pgroam. The map panels of the Providence County FIRM that are whoolly or partially wihithn the City of Woonsocket are panel numbers 44007C0069G, 44007C0088G, 44007C0157G dated March 2, 2009, and 44007C0089H, 44007C0156H, 44007C0176H, 44007C0177H, 44007C0068H, dated June 23, 2026. The exact boudnaries of the District may be defined by the 100-year base flood eleveation shown on the FIRM and further defined by the Providence County Flood Insuraance Study (FIS) report dated June 23, 2026. The office of Building Official is responsible for floodplain management. The FIRM and FIS report and any revisions thereto are for floodplain management. The FIRM and FIS report and any reveisions there to are incorporated herein by reference and are on file with the Town Clerk, Planning Board, Building Offiical, and Engineering Division of the Department of Public Works.

 

Section B. Administrative Provisions

 

1) Designation of municipal Floodplain Adminstator. The WOonscoket Buildilng Official is designated the Floodplain Administror. The Floodplain Administrator shall have the authority to delegeat performance of certain duties to other employees. The Floodplain Administrator is authorized and directed to administer the providions of these regulations and to establish policies and procedures in order to clarify the application of its provisions. Such interpretations, policies and procedures shall be consistent with the intent and purpose of these regulations and the flood provisionsof the building code and shall not have th effect of waiveing specific requirements without the graning of a variance.

 

2) Building Permit. All proposed construction or other development within a Special Flood Hazard Area shall require a permit. Prior to the issuance of a building or development permit, the applicant shall  submit evidence that all necessary permits and approvals have been received from all government agencies from which approval is required by federal or state law. A permit fee (based on the cost of the construction) may be required to be paid to the City of Woonsocket and a copy of a receip for the same shall accompany the application. An additional fee may be charged if the code enforcement officer and/or board of appeasl needs the assistance of a professional engineer. Building permits for development in the special flood hazard area shall be reveiwed by the floodplain adminstorto or their designee for:

 

(a.) Construction with material resistena to fldod damage

(b.) Construction by methods and practices that minimize flood damage, and

(c.) Construction with electrical, heating, ventilation, plubming, and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating whihin the components during conditions of flooding.

(d.) Existing countour intervals of site and elevations of existing structures must be included on plan proposal.

 

3) Discalimer of Liability. The degree of flood protection required by the ordinance is considered reasonablebut does not imply total flood protection.

 

4) Severability. If any section, provision, or portion of this ordinance is adjudged unconstitutional or invalid by a court, the remainder of the ordinance shall not be affected.

 

5) Abrogation and Greater Restriction. This ordinance shall not in any way impair/remove the necessity of compliance with any other applicable laws, ordiances, regulations, etc. Where this ordinance imposes a greater restriction, the provisision of this ordinance shall control.

 

6) Enforcement. The Building Official shall enforce all provisions as applicable in reference to RIGL 23-27.3-108.1.

 

7) Penatlies. Every person whol shall violate any provision of this code shall be subject to penalties put forth in RIGL 23-27.3-122.3.

 

8) Record Keepgin. The municipal floodplain administrator or their designee shall maintain all records of permits for development in the special flood hazard area, including but not limited to; elevation certificates, building permits, construction drawings, substantial improvements, substantial damages, floodproofing and vrainaces.

 

Sec. 7 ¼ - 4 – Notifications

 

Section A. Notification of watercourse alteration

 

1) In a riverine situation, The Woonsocket Building Department shall notify the following of any alteration or relocation of a watercourse:

 

(a.) Adjacent Communities

 

(b.) Bordering States (optional)

 

(c.) NFIP State Coordinator, Rhode Island Emergency Management Agency, 645 New London Avenue, Crantson, RI 02920

 

(d.) Risk Analysis Branch, Federal Emergency Management Agency, Region 1, 220 Binney Street, Cambridge, MA 02142

 

2) The carrying capacity of the altered or relocated watercourse shall be maintained

 

Section B. Notification of physical change effecting flood elevations

 

1) The Woonsocket Building Official shall notify the Administrator of the Federal Emergency Management Agency of physical changes affecting the flood elevation, flood hazard area boundaries, or floodway designations by submitting technical or scientific data in accordance with this part. Such a submission is necessary so that upon confirmation of those physical changes affecting flooding conditions, risk premium rates and flood plain management requirements will be based upon current data. Submission will occur as soon as practicable, but not later than the six months after the date such information becomes available.

 

Sec. 7 ¼ – 5 – Use Regulations

 

Section A. Reference to existing regulations

 

1) Compliance with existing state regulations. The Special Flood Hazard Areas are established as a floodplain overlay district. All development in the district, including structural and non-structural activities, whether permitted by right or by special permit, must be in compliance with the following:

 

(a.) Rhode Island State Building Code (as established under Rhode Island General Law (RIGL 23-27.3)

 

(b.) Coastal Resources Management Act, Rhode Island Coastal Resources Management Council (RIGL 46-23)

 

(c.) Endangered Species Act, Rhode Island Department of Environmental Management (RIGL 20-1-2)

 

(d.) Freshwater Wetlands Act, Rhode Island Department of Environmental Management (RIGL 2-1-18)

 

(e.) Minimum Standards Related to Individual Sewage Disposal Systems, Rhode Island Department of Environmental Management (RIGL 5-56, 5-56.1, 2319.15, 23-19.5, 23-24.3, 42-17.1, and 46-13.2)

 

(f.) Water Quality Regulations, Rhode Island Department of Environmental Management (RIGL 42-17.1 and 42-17.6 and 46-12)

 

Section B. Other Use Regulations

 

1) Residential Structures in the A and AE Zones. Require that all new construction and substantial improvements of residential structures within Zones A and AE zones on the community’s FIRM have the lowest floor (including basement) elevated to or above the base flood level, unless the community is granted an exception by the Federal Insurance Administrator for the allowance of basements; and

 

(a.) Have fully enclosed areas below the lowest floor shall be used solely for parking of vehicles, building access or storage in an area other than a basement and which is subject to flooding shall be designed to automatically equalize hydrostatic flood acres on exterior walls by allowing the entry and exit of floodwaters

 

2) Non-residential Structures in the A and AE Zone require that all new construction and substantial improvements of non-residential structures within Zones A, and AE zones on the community’s FIRM:

 

(a.) Have the lowest floor (including basement) elevated to or above the base flood level and have fully enclosed areas below the lowest floor used solely for parking of vehicles, building access or storage in an area other than a basement and which is subject to flooding shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing the entry and exit of floodwaters; or

 

(b.) Together with the attendant utility and sanitary facilities, be designed so that below he base flood level the structure is watertight with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads and effect of buoyancy;

 

(i.) A registered professional engineer or architect shall develop and/or review structural design, specifications, and plans for the construction, and shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the requirements of section (3)(b) of this section


3) Other source of BFE data in A Zones. In A Zones, in the absence of FEMA BFE data and floodway data, obtain, review and reasonably utilize and bas flood elevation and floodway data available from a Federal , State, or other source as criteria for requiring that a new construction, substantial improvements, or other development in Zone A on the community’s FHBM or FIRM meet the standards in section 3(a) and 3(b) of this section

 

4) Detached accessory structures in Zone A, AE, detached accessory structures in Zones A, AE, (i.e., garages, sheds) do not have to meet the elevation or dry flood-proofing requirement if the following standards are met:

 

(a.) The structure has a value of less than $1000.

 

(b.) The structure has unfinished interiors and must not be used for human habitation. An apartment, office or other finished space over a detached garage is considered human habitation and would require the structure to be elevated.

 

(c.) The structure is not in the floodway.

 

(d.) The structure is not used for storage of hazardous materials.

 

(e.) The structure is used solely for parking of vehicles and/or limited storage.

 

(f.) The accessory must be wet floodproofed and designed to allow for the automatic entry and exit of flood water.

 

(g.) The accessory structure shall be firmly anchored to prevent flotation, collapse, and lateral movement.

 

(h.) Service facilities such as electrical, mechanical, and heating equipment must be elevated or floodproofed to or above the base flood elevation.

 

(i.) The structure must not increase the flood levels in the floodway.

 

5) Subdivision Proposals in the Special Flood Hazard Area. All subdivision proposals must be designed to assure that:

 

(a.) Such proposals minimize flood damage:

 

(b.) All public utilities and facilities are located and constructed to minimize or eliminate flood damage; and

 

(c.) Adequate drainage is provided to reduce exposure to flood hazards.

 

6) Utilities in the Special Flood Hazard Area. Within flood-prone areas, all residential utilities shall be:

 

(a.) New and replacement water supply systems to be designed to minimize or eliminate infiltration of flood waters into the systems;

 

(b.) New and replacement sanitary sewage systems to be designed to minimize or eliminate infiltration of flood waters in the systems and discharges from the systems into flood waters and onsite waste disposal systems to be located to avoid impairment to them or contamination from the during flooding.

 

7) Change of Structural Use. No person shall change from business/commercial to residential use of any structure or property located in the floodway of a Special Flood Hazard Area as to result in a use or expansion that could increase the risk to the occupants.

 

8) Manufactured Homes. The community shall require that manufactured homes that are placed or substantially improved within Zones A and AE on the community’s FIRM on sites:

 

(a.) Outside of a manufactured home park or subdivision.

 

(b.) In a new manufactured home park or subdivision.

 

(c.) In an expansion to an existing manufactured home park or subdivision; or,

 

(d.) In an existing manufactured home park or subdivision on which a manufactured home has incurred “substantial damage” as the result of a flood, be elevated on a permanent foundation such that the lowest floor of the manufactured home is elevated to or above the base flood elevation and be securely anchored to an adequately anchored foundation system to resist floatation collapse and lateral movement or the chassis is supported by reinforced piers no less than 36 inches in height above grade and securely anchored.

 

9) Recreation Vehicles. Recreational vehicles placed on sites within Zones AE on the community’s FIRM are required to be either:

 

(a.) Be on the site for fewer than 180 consecutive days.

 

(b.) Be fully licensed and ready for highway use, or

 

(c.) Meet the permit requirements of Article II, Section B.(2) of this chapter and the elevation and anchoring requirements for “manufactured homes” in (12)(d) of this section.

 

Section C. Base Flood Elevation, Floodway Data, and Floodway Encroachment

 

1) Floodway Data in Zones without and Established Regulatory Floodway. In Zones A and AE, along watercourses that have not had a regulatory floodway designated, the best available Federal, State, local, or other floodway dada shall be used to prohibit encroachments in floodways which would result in any increase in flood levels within the community during the occurrence of the base flood discharge.

 

2) Adoption of Regulatory Floodway. When the Federal Insurance Administrator has provided a notice of finals base flood elevations within Zones AE on the community’s FIRM and A zones on the community’s FIFM, and has provided date from which the community shall designate its regulatory floodway, the community shall:

 

(a.) Select and adopt a regulatory floodway based on the principle that the area chosen for the regulatory floodway must be designed to carry the waters of the base flood, without increasing the water surface elevation of that flood more than one foot an any point.

 

(b.) Prohibit encroachments, including fill, new construction, substantial improvements, and other development withing the adopted regulatory floodway unless it has been demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the propose encroachment would not result in any increase in flood levels withing the community during the occurrence of the base flood discharge;

 

3) Encroachment in AE Zones. In Zones AE along watercourses that have a regulatory floodway designated on the Providence County FIRM encroachments are prohibited in the regulatory floodway which would result in any increase in flood levels within the community during the occurrence of the base flood discharge.

 

4) Base Flood Elevation Data. Base flood elevation data is required for subdivision proposals or other developments greater than fifty (50) lots of 5 acres, whichever is the lesser, within unnumbered A zones.

5) Base Flood Elevations in A Zones. In the absence of FEMA BFE data and floodway data, the best available Federal, State, local, or other BFE or floodway data shall be used as the basis for elevating residential and non-residential structures to or above the base flood level and for floodproofing non-residential structures to or above the flood level.

(Ord. 8616, Sec. 3, 4/20/2026)

 